Vicon Roughneck V920D Series Guía de instalación Pagina 13

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 82
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 12
Installation Options
5. Fasten the base to the wall or ceiling with the appropriate hardware for the mounting surface, lag
bolts and sleeve for cement surfaces or machine screws for other surfaces.M6x35 tapping screws
are supplied for use, if suitable. A rubber washer is provided for each mounting hole for
environmental sealing. If the rear cable access is used, be sure that holes are aligned correctly so
the cable is routed to allow a flush installation of the base. As a mounting alternative, align the
mounting holes with a 4 x 4 electrical box and fasten the base to the box with machine screws.
13
Vista de pagina 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 81 82

Comentarios a estos manuales

Sin comentarios